EOQ Calculator
Calculate the Economic Order Quantity — the ideal order size that minimises total ordering and holding costs. Enter your numbers and get the answer instantly.
Your numbers
Total units sold per year
Freight + admin per order
Storage + insurance per unit
The formula
Total units you sell or use per year
Total cost to place one order: freight, admin, receiving labour
Annual cost to store one unit: rent, insurance, capital, shrinkage
EOQ finds the sweet spot between two competing costs. Order too rarely → fewer order fees but more storage cost. Order too often → lower storage but more order fees. The formula minimises the sum of both.
Worked example
You sell 10,000 units/year. Each order costs $50 in freight and admin. Storing one unit for a year costs $5.
Order 447 units at a time, roughly every 16 days (10,000 ÷ 447 × 365). Total annual ordering + holding cost: ~$2,236. Ordering 100 units at a time would cost ~$5,250/year. Ordering 1,000 at a time: ~$3,000/year.
What counts as order cost?
Freight charges, admin time (staff hourly rate × time per PO), receiving labour, inspection costs, any per-order supplier fee.
What counts as holding cost?
Storage rent per unit, insurance, capital cost (interest on inventory investment), shrinkage rate, obsolescence risk. Typically 20–30% of unit cost/year.
High-volume products
EOQ has the biggest impact on fast-movers. Apply it to your top 20% of SKUs by volume first — they drive 80% of your ordering cost.
Supplier MOQs
If your EOQ is below the supplier's minimum order quantity, round up. The cost premium is small and you still benefit from the formula's structure.
Common questions
Does EOQ work for all products?
Best for products with steady, predictable demand. For highly seasonal items, calculate EOQ per period (e.g. peak vs. off-peak) using period-specific demand figures.
What if demand is uncertain?
EOQ assumes steady demand. For variable demand, combine EOQ with a safety stock calculation — EOQ gives the order size, safety stock covers the variability.
Should I use revenue or units for demand?
Always units — EOQ is a physical quantity calculation. Revenue fluctuates with price changes and doesn't reflect the actual stock movement you're trying to optimise.
How is EOQ different from reorder point?
EOQ answers 'how much should I order?' Reorder point answers 'when should I order?' You need both — use this calculator for order size, then use the Reorder Point Calculator for timing.
More free tools
Automate reorders in Invyra
Invyra calculates optimal order quantities per SKU and raises purchase orders automatically when stock hits the trigger level.
Start freeNo credit card · Cancel anytime